BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//NECX//Session//EN
BEGIN:VEVENT
UID:NECX_SESSION_116
DTSTAMP:20260726T101316Z
DTSTART:20260825T143000Z
DTEND:20260825T144000Z
SEQUENCE:0
CLASS:PUBLIC
SUMMARY:Closing the Nuclear Skilled-Trades Gap: A Project-Anchored Pathway Through Two-Year and Technical Colleges
LOCATION:
DESCRIPTION:2026 Nuclear Energy Conference & Expo\n\nRead More: https://nuclearenergyconference.org/session/view-116/\n\n<p>\nDOE projects the nuclear build-out labor force must grow from approximately 100,000 workers to 375,000 by 2050, with 235,000 required by 2035; the skilled trades, approximately 90,000 workers, are the most constrained category. Vogtle Units 3 and 4 quantified the consequence: more than 30,000 workers trained in execution, and labor shortage and turnover contributed to multi-year delay and multi-billion-dollar overrun. The cause is structural: developers fund operator training because its benefit is appropriable, and TerraPower and X-energy have built operator training centers; craft labor circulates among contractors, so no single firm captures the return on training welders, and the shared craft layer goes underbuilt.</p><p>\n\n\nThis presentation, developed through the 2026 ANS WISE program at the Nuclear Energy Institute, lays out an implementation pathway built on existing instruments: a dedicated two-year and technical college track in round two of DOE's $100 million nuclear workforce program, patterned on DOE's 2023 Industrial Assessment Center expansion; college-led consortia pairing union training partners with state and employer cost-share sponsors; Workforce Pell designation, effective July 2026, funding students through existing aid; and NRC Section 402 traineeships. The pathway is mapped to three regions where reactor, college, and labor align: Clinch River, Tennessee; Kemmerer, Wyoming; and Seadrift, Texas.</p><p>\n\nTakeaways: the employer participation case (cost-share commitments in the single-digit millions against schedule exposure in the billions), a consortium structure aligned with the Bechtel and NABTU memorandum, and the timeline: program decisions in 2026 and 2027 determine site labor supply for 2029 to 2032 mobilizations.</p>
END:VEVENT
END:VCALENDAR
